Bennetts Creek BESS - Under Construction
project impact at a glance
Approx. figures.
- Capability: BESS
- Type: Civil & Electrical
- Location: Hazlewood North, VIC
- Completion: Q4 2028
- Indicative Output: 100MW / 223MWh
Zenviron are excited to be engaged by Flow Power to deliver the balance of plant design, construction, installation and commissioning of the Bennetts Creek BESS.
With a footprint of approximately 2.3 hectares and a planned output of 100 MW / 200 MWh, the Bennetts Creek Battery is Flow Power’s largest Battery Energy Storage System (BESS) project to date.
Located near Hazelwood North in Victoria’s Latrobe Valley, this project will incorporate:
- 100 MW / 200MWh Battery Energy Storage System (BESS) including a 66 kV transformer and 3.5 MW inverters
- A new 66 kV transmission line connection to the existing Morwell Terminal Substation
- An onsite substation
- An operational and maintenance facility with control room
The BESS project is expected to be completed in 2028 and will be a significant addition to Flow Power’s 100% renewable generation portfolio.